Raising project finance for an onshore wind farm - Santander Corporate and Commercial

Santander Corporate and Commercial

 

​​​​​​​Challenge:

We acted for an infrastructure fund in raising project finance to allow the construction of a 9MW onshore wind farm.

Solution:

We tendered the financing to drive optimal debt for the project, and produced accurate financial models to deliver the project finance. The wind farm used new turbines which the bank needed to get comfortable with in order to make the project financeable.

Result:

We secured £12m of project finance debt from Santander UK to allow the wind farm to be constructed.

All Case Studies

 

 

Sun Microsystems/emea/en-gb/case-studies/88/sun-microsystemsSun MicrosystemsIf the motto of the Facility Management Team at Jones Lang LaSalle is to climb every mountain, then Sun Microsystems challenged us to climb Mount Everest.
Grand Designs : Retail development in Cambridge (UK)/emea/en-gb/case-studies/89/grand-designs-retail-development-in-cambridge-ukGrand Designs : Retail development in Cambridge (UK)
French Value Add Club Deal/emea/en-gb/case-studies/93/french-value-add-club-dealFrench Value Add Club Deal